Utility work for BT Openreach is required at the C343 Hill Road from its junction with C343 The Street for 400 metres eastwards – in consequence traffic over the said road should be prohibited with effect from 23rd October 2017 to 27th October 2017 for the duration of the works expected to be about 5 days within the period
